Upcoming Construction Activities Crews will continue trenching for fiber conduit installation in the traffic lanes at the following locations: - Milepost (MP) 460.5 to 461.5 (near Canyon Entrance Park)
- Milepost (MP) 480 to 482 (near Tony Grove Rd)
This work includes rock saw excavation, allowing for precise material removal with minimal impact to surrounding structures. Please drive with caution through the work zones.
Drivers can anticipate heavy traffic delays and signalized one-way traffic at multiple locations throughout the project area. |
No comments:
Post a Comment