Upcoming Construction Activities Crews will continue trenching for fiber conduit installation in the traffic lanes at the following locations: - Milepost (MP) 462.5 to 463.5 (near Canyon Rd and Canyon Entrance Park)
- MP 474.5 to 476.5 (near Right Hand Fork)
Crews will continue paving in the traffic lanes at the following locations: - MP 474 to 478 (near Temple Fork Rd)
This work includes rock saw excavation, allowing for precise material removal with minimal impact to surrounding structures. Please drive with caution through the work zones. Impact to travel will be minimal near Canyon Entrance Park, but traffic will occasionally have to stop for 5 minutes for machinery maintenance.
Drivers can anticipate heavy traffic delays and signalized one-way traffic at one location throughout the project area. |
No comments:
Post a Comment