Contribute news or contact us by sending an email to: RCTonline@gmail.com

Monday, August 4, 2025

Beaver Creek Construction Update

 

Construction Update | August 1, 2025

Raspberry Days

Construction activities will pause on Wednesday, August 6, at 7 p.m., through Monday, August 11, at 5 a.m. Traffic control will remain in the area for safety and to protect the work zones.

Ongoing Work

Crews are continuing to resurface the road. Large equipment will be in the area with one-way flagging operations. Drivers should expect delays and use caution when traveling through the area.


Upcoming Work

  • Rip rap installation
  • Guard rail installation


What is rip rap?

Rip rap is layer of large stones used to prevent erosion and help maintain structural integrity of the supporting structures. Rip rap is used in areas that my be vulnerable to water erosion.


Crews trenching across the road for pipe installation.

CAUTION: Motorcycle, Cyclists, and Drivers

Road resurfacing causes uneven road surfaces, and loose gravel throughout the corridor. Please use caution and prioritize safety while travelling through the construction area. Reduce speed, follow posted signage, and be alert of crew members and equipment.


Project Overview

The Utah Department of Transportation (UDOT) is completing a roadway replacement project on US-89 from Beaver Creek Resort to milepost (MP) 492 in Logan Canyon, spanning approximately 6 miles. The project will extend the life of the roadway, replace damaged signage and guardrail, and update drainage culverts. This project will provide drivers with improved mobility and safety throughout the corridor.

What to Expect

  • Daytime work Monday through Thursday (7 a.m. – 7 p.m.)
  • Occasional nighttime work
  • Noise, dust, and vibration
  • Occasional canyon closures and lane restrictions
  • Heavy equipment, support vehicles, and crew members

*Construction schedules are subject to change due to weather, utility, and material delays.

Logan Canyon Fiber Project

The Utah Department of Transportation (UDOT) is undertaking a project to install fiber-optic cable in Logan Canyon. This fiber optic cable installation will improve broadband access in Logan Canyon, allowing for easier and more reliable community connection for Logan City, Garden City, and Beaver Mountain Resort. It will also strengthen and enhance communication capabilities, strengthen emergency service support, and create opportunities for these communities to expand services and improve connectivity.

Stay Informed

Want the latest? Sign up for email updates by emailing US89beavercreek@utah.gov with "Subscribe" in the subject line.

Know before you go! Check UDOT Traffic today!


The UDOT Traffic app provides commuters and travelers with mobile access to information for the State of Utah roadways.


Download for Android

Download for Apple

Contact Us

Public Involvement Team

Hotline: 801-996-7086

Email: US89beavercreek@utah.gov

Website: udotinput.utah.gov/US89beavercreek

No comments: